For many Irish businesses, late December means closing down or running with reduced staffing while most people are away. A closure that is well planned is usually uneventful. One that is improvised on the last afternoon can leave equipment unsafe, sites open to intruders and no one clear on who responds if something goes wrong.
This checklist follows the three points where someone needs to act: before closure, during the break and before reopening. Winter checks are included at the stage where they need to happen.
What the law expects over the break
Your legal duties don't pause for Christmas. Section 8 of the Safety, Health and Welfare at Work Act 2005 requires employers to manage and conduct work activities so as to protect employees' safety, health and welfare. Section 11 requires adequate emergency plans for firefighting and evacuation, with designated employees to carry them out. Under Section 19, your risk assessments should reflect significant changes, and a closure or reduced staffing is one of them.
Stage 1: Before closure
1. Plan early and name an owner
First, name one person to own the shutdown plan and sign off each item. Then start planning early. A week or two is enough for a simple office closure. However, you may need to book specialist checks, servicing and contractor work several weeks ahead.
The plan should cover:
- the closure and reopening dates, and which parts of the site close
- updated risk assessments for the closure and any work during it
- current contacts for key-holders, alarm monitoring and on-call managers
- a briefing for all staff on what happens and who to contact
2. Decide who will be on site
If any work continues over the break, put the reduced staffing arrangements in writing:
- who will be on site, and when
- which tasks they can do, and which must wait until January
- who provides cover if someone is ill or plans change
3. Shut equipment down safely
For a routine shutdown, follow the manufacturer's instructions and your own procedures. On the other hand, some work calls for more. If you plan maintenance during the break, or your risk assessment identifies a specific risk, isolate the equipment. Then apply lock-out/tag-out under your isolation procedure.
4. Keep essential systems running
Some systems must keep running while you are closed. So confirm which ones apply to your site, and who checks them:
- fire detection, alarms and sprinklers
- alarm and CCTV monitoring
- frost protection and minimum heating, where required
- emergency lighting
5. Reduce the fire risk
A fire in an empty building can burn for longer before anyone notices. Before you close:
- remove waste, packaging and combustible materials
- switch off non-essential electrical equipment
- keep fire doors closed and escape routes clear
- store flammable substances and gas cylinders correctly
6. Secure construction sites
Secure the site against unauthorised access and protect against foreseeable hazards:
- check that perimeter fencing and hoarding are intact
- remove or block scaffold access
- cover or fence excavations
- immobilise plant, remove keys and secure fuel
- store materials so they can't fall or blow about in a storm
7. Prepare for winter weather
Winter conditions can change the level of risk and the controls you need. Before closure:
- agree who grits access routes for anyone on site, and keep salt or grit in stock
- check that external lighting works on car parks, yards and access routes
- review journeys planned for the break and agree when to defer travel, such as during a Met Éireann warning
Stage 2: During the break
1. Protect lone workers
Security staff, maintenance teams and people covering essential services often work alone over the holidays. For this reason, your risk assessment should decide which tasks one person can do alone. It should also say which tasks need a second person.
For anyone working alone:
- agree check-in times and a reliable way to raise the alarm
- set out what happens after a missed check-in: who gets the alert, who responds out of hours and how quickly
- confirm first aid arrangements and access for emergency services
Higher-risk work needs specific controls. For example, if you plan confined-space entry, put suitable emergency and rescue arrangements in place before anyone enters. Similarly, work at height should only go ahead with the right equipment, a competent person and a rescue plan.
2. Monitor the site
During longer closures, arrange regular security visits. After a storm, a nominated person should check the site for damage before anyone works there again. Meanwhile, staff who drive for work should follow the travel arrangements you agreed before closure. Outdoor workers also need suitable clothing, breaks in a warm area and hot drinks.
Stage 3: Before reopening
1. Decide who signs off reopening
Name the person who will confirm the site is ready to reopen. In addition, agree in advance what would delay reopening. Examples include storm damage, a fire system fault or unfinished maintenance work.
2. Walk the site
Before staff return, carry out a visual check:
- storm damage, leaks or signs of intrusion
- escape routes clear and fire doors closed
- external lighting working and access routes free of ice
- heating and ventilation running
Also, flush any water outlets nobody used during the closure. This reduces the risk of Legionella.
3. Test and hand back
A visual check of escape routes is not a test of fire alarms and emergency lighting. Therefore, make sure a competent person has carried out any testing or servicing that is due.
If anyone worked on equipment during the break, confirm the formal handover first. Close any permits before the equipment returns to service. Finally, check idle equipment before you start it up.
4. Brief your team
On the first morning back, hold a short briefing or toolbox talk. Cover anything that changed during the break and remind people how to report hazards.
Your checklist at a glance
Before closure
- Name an owner for the shutdown plan
- Update risk assessments for closure and reduced staffing
- Complete the routine shutdown, and isolate and lock out equipment where maintenance or identified risks require it
- Confirm that fire detection, monitoring and frost protection stay on
- Remove waste and combustibles
- Secure construction sites against unauthorised access
- Agree gritting, lighting and travel arrangements
During the break
- Agree which tasks people can do alone, and who responds to missed check-ins out of hours
- Put rescue arrangements in place before any confined-space entry
- Arrange security visits and post-storm checks
Before reopening
- Name the person who signs off reopening
- Walk the site and complete a visual check
- Bring fire alarm and emergency lighting tests up to date
- Complete the formal handover of any equipment that had work during the break
- Hold a team briefing
How Holland Safety can help
Not sure your arrangements will hold up over the break? A pre-shutdown safety audit can find the gaps while you still have time to fix them. Our consultants can also review your risk assessments for closure, lone working and reduced staffing.
Need to train people before the break? Our eLearning courses include Fire Warden Training, Working at Heights and Ladder Safety. Your staff can complete them online in time for the holidays.
Book a site safety audit before you close for Christmas. Contact us
Frequently asked questions
1. Do I need a separate risk assessment for the Christmas shutdown?
Not necessarily a separate document. However, your risk assessments should cover the closure, reduced staffing and lone working. They should also cover shutting down and restarting equipment. If they don't, update them.
2. Who is responsible for a construction site while it is closed?
It depends on the project arrangements. The contractor in control of the site should agree in advance who secures and inspects it during the closure. Where you have appointed a PSCS, they should take part too.
3. What should a lone worker check-in system include?
It needs agreed check-in times and a named person who monitors them. It also needs a clear procedure for missed check-ins that says who responds out of hours. Finally, the worker needs a reliable way to raise the alarm.
Holland Safety is an integrated safety solutions provider with over 20 years of experience as a specialist in safety training, consultancy, and contract placement. We support some of Ireland's largest organisations operating in manufacturing, construction, pharmaceutical, and government sectors.
We are committed to developing innovative solutions for our clients that are compliant, sustainable, efficient, and cost effective, enabling the achievement of their health and safety goals.